Assembly Of The International Space Station

The process of assembling the International Space Station (ISS) has been under way since the 1990s.

Zarya, the first ISS module, was launched by a Proton rocket on 20 November 1998. The STS-88 Space Shuttle mission followed two weeks after Zarya was launched, bringing Unity, the first of three node modules, and connecting it to Zarya. This bare 2-module core of the ISS remained uncrewed for the next one and a half years, until in July 2000 the Russian module Zvezda was launched by a Proton rocket, allowing a maximum crew of three astronauts or cosmonauts to be on the ISS permanently.

Assembly Of The International Space Station
Animation of the assembly of the International Space Station

The ISS has a pressurized volume of approximately 1,000 cubic metres (35,000 cu ft), a mass of approximately 410,000 kilograms (900,000 lb), approximately 100 kilowatts of power output, a truss 108.4 metres (356 ft) long, modules 74 metres (243 ft) long, and a crew of seven. Building the complete station required more than 40 assembly flights. As of 2020, 36 Space Shuttle flights delivered ISS elements. Other assembly flights consisted of modules lifted by the Falcon 9, Russian Proton rocket or, in the case of Pirs and Poisk, the Soyuz-U rocket.

Some of the larger modules include:

Logistics

Assembly Of The International Space Station 
International Space Station mockup at Johnson Space Center in Houston, Texas.

The space station is located in orbit around the Earth at an altitude of approximately 410 km (250 mi), a type of orbit usually termed low Earth orbit (the actual height varies over time by several kilometers due to atmospheric drag and reboosts). It orbits Earth in a period of about 90 minutes; by August 2007 it had completed more than 50,000 orbits since launch of Zarya on 20 November 1998.

A total of 14 main pressurized modules were scheduled to be part of the ISS by its completion date in 2010. A number of smaller pressurized sections will be adjunct to them (Soyuz spacecraft (permanently 2 as lifeboats – 6 months rotations), Progress transporters (2 or more), the Quest and Pirs airlocks, as well as periodically the H-II Transfer Vehicle).

The US Orbital Segment was completed in 2011 after the installation of the Alpha Magnetic Spectrometer during the STS-134 mission. The Russian Orbital Segment assembly has been on an indefinite hiatus since the installation of the Rassvet module in 2010 during the STS-132 mission. The Rassvet module on the ISS right now was originally supposed to be the on-ground dynamic testing mock-up of the now-cancelled Science Power Platform. The Nauka science laboratory module contains new crew quarters, life support equipment that can produce oxygen and water, and a new galley. The Nauka was originally supposed to be delivered to the ISS in 2007 but cost overruns and quality control problems delayed it for over a decade. The Nauka module finally launched in July 2021 and docked to the nadir port of Zvezda module after several days of free flight followed by the Prichal which launched on 24 November 2021.

There are plans to add 2 or 3 more modules that would attach to Prichal during the mid-2020s. Adding more Russian modules will help the Zvezda module greatly because Zvezda's originally installed central command computers no longer work (three ThinkPad laptops are now the Zvezda's central command computers) and its Elektron oxygen generators are not replaceable and failed again for a short time in 2020 after multiple malfunctions throughout their history. In Russian modules all the hardware is launched with the equipment permanently installed. It is impossible to replace hardware like in the US Orbital Segment with its very wide 51 inch (105 cm) hatch openings between modules. This potential problem with the Zvezda was made apparent when in October 2020 the toilet, oven, and Elektron all malfunctioned at the same time and the cosmonauts onboard had to make emergency repairs.

The ISS, when completed, will consist of a set of communicating pressurized modules connected to a truss, on which four large pairs of photovoltaic modules (solar panels) are attached. The pressurized modules and the truss are perpendicular: the truss spanning from starboard to port and the habitable zone extending on the aft-forward axis. Although during the construction the station attitude may vary, when all four photovoltaic modules are in their definitive position the aft-forward axis will be parallel to the velocity vector.

In addition to the assembly and utilization flights, approximately 30 Progress spacecraft flights are required to provide logistics until 2010. Experimental equipment, fuel and consumables are and will be delivered by all vehicles visiting the ISS: the SpaceX Dragon, the Russian Progress, the European ATV and the Japanese HTV, and space station downmass will be carried back to Earth facilities on the Dragon.

Columbia disaster and changes in construction plans

Assembly Of The International Space Station 
Columbia lifting off on its final mission.

Disaster and consequences

Assembly Of The International Space Station 
10 March 2001 – The Leonardo Multi-Purpose Logistics Module rests in Space Shuttle Discovery's payload bay during STS-102.

After the Space Shuttle Columbia disaster on 1 February 2003, there was some uncertainty over the future of the ISS. The subsequent two and a half-year suspension of the U.S. Space Shuttle program, followed by problems with resuming flight operations in 2005, were major obstacles.[citation needed]

The Space Shuttle program resumed flight on 26 July 2005, with the STS-114 mission of Discovery. This mission to the ISS was intended both to test new safety measures implemented since the Columbia disaster and deliver supplies to the station. Although the mission succeeded safely, it was not without risk; foam was shed by the external tank, leading NASA to announce future missions would be grounded until this issue was resolved.[citation needed]

Between the Columbia disaster and the resumption of Shuttle launches, crew exchanges were carried out solely using the Russian Soyuz spacecraft. Starting with Expedition 7, two-astronaut caretaker crews were launched in contrast to the previously launched crews of three. Because the ISS had not been visited by a shuttle for an extended period, a larger than planned amount of waste accumulated, temporarily hindering station operations in 2004. However Progress transports and the STS-114 shuttle flight took care of this problem.[citation needed]

Changes in construction plans

Assembly Of The International Space Station 
Construction of the International Space Station over New Zealand.

Many changes were made to the originally planned ISS, even before the Columbia disaster. Modules and other structures were cancelled or replaced, and the number of Shuttle flights to the ISS was reduced from previously planned numbers. However, more than 80% of the hardware intended to be part of the ISS in the late 1990s was orbited and is now part of the ISS's configuration.[citation needed]

During the shuttle stand-down, construction of the ISS was halted and the science conducted aboard was limited due to the crew size of two, adding to earlier delays due to Shuttle problems and the Russian space agency's budget constraints.[citation needed]

In March 2006, a meeting of the heads of the five participating space agencies accepted the new ISS construction schedule that planned to complete the ISS by 2010.

As of May 2009, a crew of six has been established following 12 Shuttle construction flights after the second "Return to Flight" mission STS-121. Requirements for stepping up the crew size included enhanced environmental support on the ISS, a second Soyuz permanently docked on the station to function as a second 'lifeboat', more frequent Progress flights to provide double the amount of consumables, more fuel for orbit raising maneuvers, and a sufficient supply line of experimental equipment.[citation needed] As of November 2020, the crew capacity has increased to seven due to the launch of Crew Dragon by SpaceX, which can carry 4 astronauts to the ISS.

Later additions included the Bigelow Expandable Activity Module (BEAM) in 2016, and numerous Russian components are planned as part of the in-orbit construction of OPSEK.[citation needed]

Assembly sequence

Assembly Of The International Space Station 
ISS elements
Assembly Of The International Space Station 
Structure of the International Space Station in mid-June 2023, after the installation of six iROSAs

The ISS is made up of 16 pressurized modules: six Russian modules (Zarya, Zvezda, Poisk, Rassvet, Nauka, and Prichal), eight US modules (BEAM, Leonardo, Harmony, Quest, Tranquility, Unity, Cupola, and Destiny), one Japanese module (Kibō) and one European module (Columbus).

At least one Russian pressurized module (Pirs) is deorbited till now.

Although not permanently docked with the ISS, Multi-Purpose Logistics Modules (MPLMs) formed part of the ISS during some Shuttle missions. An MPLM was attached to Harmony (initially to Unity) and was used for resupply and logistics flights.[citation needed]

Spacecraft attached to the ISS also extend the pressurized volume. At least one Soyuz spacecraft is always docked as a 'lifeboat' and is replaced every six months by a new Soyuz as part of crew rotation. Table below shows the sequence in which these components were added to the ISS. Decommissioned and deorbited Modules are shown in gray.

Element Assembly
flight
Launch
date
Launch
vehicle
Length Diameter Mass Isolated View Station View
Zarya (FGB) 1A/R 1998-11-20 Proton-K 12.56 m (41.2 ft) 4.1 m (13 ft) 24,968 kg (55,045 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Unity (Node 1) 2A 1998-12-04 Space Shuttle Endeavour (STS-88) 5.5 m (18 ft) 4.3 m (14 ft) 11,895 kg (26,224 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
PMA-1 1.86 m (6 ft 1 in) 1.9 m (6 ft 3 in) 1,589 kg (3,503 lb) Assembly Of The International Space Station 
PMA-2 1.86 m (6 ft 1 in) 1.9 m (6 ft 3 in) 1,376 kg (3,034 lb) Assembly Of The International Space Station 
Zvezda (Service Module) 1R 2000-07-12 Proton-K 13.1 m (43 ft) 4.2 m (14 ft) 24,604 kg (54,243 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Z1 Truss 3A 2000-10-11 Space Shuttle Discovery (STS-92) 4.6 m (15 ft) 4.2 m (14 ft) 8,755 kg (19,301 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
PMA-3 1.86 m (6 ft 1 in) 1.9 m (6 ft 3 in) 1,183 kg (2,608 lb) Assembly Of The International Space Station 
P6 Truss & Solar Arrays 4A 2000-11-30 Space Shuttle Endeavour (STS-97) 18.3 m (60 ft) 10.7 m (35 ft) deployed 15,824 kg (34,886 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Destiny (US Laboratory) 5A 2001-02-07 Space Shuttle Atlantis (STS-98) 9.2 m (30 ft) 4.3 m (14 ft) 14,515 kg (32,000 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
ESP-1 5A.1 2001-03-08 Space Shuttle Discovery (STS-102) Assembly Of The International Space Station  Assembly Of The International Space Station 
Canadarm2 (SSRMS) 6A 2001-04-19 Space Shuttle Endeavour (STS-100) Assembly Of The International Space Station  Assembly Of The International Space Station 
Quest (Joint Airlock) 7A 2001-07-12 Space Shuttle Atlantis (STS-104) 5.5 m (18 ft) 4.0 m (13.1 ft) 9,923 kg (21,876 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Pirs (Docking Compartment) 4R 2001-09-14 Soyuz-U (Progress M-SO1) 4.9 m (16 ft) 2.55 m (8.4 ft) 3,838 kg (8,461 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
S0 Truss 8A 2002-04-08 Space Shuttle Atlantis (STS-110) 13.4 m (44 ft) 4.6 m (15 ft) 13,971 kg (30,801 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Mobile Base System UF2 2002-06-05 Space Shuttle Endeavour (STS-111) Assembly Of The International Space Station  Assembly Of The International Space Station 
S1 Truss 9A 2002-10-07 Space Shuttle Atlantis (STS-112) 13.7 m (45 ft) 4.6 m (15 ft) 14,124 kg (31,138 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
P1 Truss 11A 2002-11-23 Space Shuttle Endeavour (STS-113) 13.7 m (45 ft) 4.6 m (15 ft) 14,003 kg (30,871 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
ESP-2 LF1 2005-07-26 Space Shuttle Discovery (STS-114) Assembly Of The International Space Station  Assembly Of The International Space Station 
P3/P4 Truss & Solar Arrays 12A 2006-09-09 Space Shuttle Atlantis (STS-115) 13.7 m (45 ft) 4.6 m (15 ft) 15,824 kg (34,886 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
P5 Truss 12A.1 2006-12-09 Space Shuttle Discovery (STS-116) 3.37 m (11.1 ft) 4.55 m (14.9 ft) 1,864 kg (4,109 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
S3/S4 Truss & Solar Arrays 13A 2007-06-08 Space Shuttle Atlantis (STS-117) 13.7 m (45 ft) 10.7 m (35 ft) 15,824 kg (34,886 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
S5 Truss 13A.1 2007-08-08 Space Shuttle Endeavour (STS-118) 3.37 m (11.1 ft) 4.55 m (14.9 ft) 1,864 kg (4,109 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
ESP-3 Assembly Of The International Space Station 
Harmony (Node 2) 10A 2007-10-23 Space Shuttle Discovery (STS-120) 7.2 m

(24 ft)

4.4 m

(14 ft)

14,300 kg (31,500 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Relocation of
P6 Truss
18.3 m (60 ft) 10.7 m (35 ft) deployed 15,824 kg (34,886 lb) Assembly Of The International Space Station 
Columbus (European Laboratory) 1E 2008-02-07 Space Shuttle Atlantis (STS-122) 7 m

(23 ft)

4.5 m

(15 ft)

12,800 kg (28,219 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Dextre (SPDM) 1J/A 2008-03-11 Space Shuttle Endeavour (STS-123) Assembly Of The International Space Station  Assembly Of The International Space Station 
Experiment Logistics Module (ELM) 4.21 m (13.8 ft) 4.39 m (14.4 ft) 8,386 kg (18,488 lb) Assembly Of The International Space Station 
JEM Pressurized Module (JEM-PM) 1J 2008-05-31 Space Shuttle Discovery (STS-124) 11.19 m (36.7 ft) 4.39 m (14.4 ft) 15,900 kg (35,100 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
JEM Remote Manipulator System (JEMRMS)
S6 Truss & Solar Arrays 15A 2009-03-15 Space Shuttle Discovery (STS-119) 18.3 m (60 ft) 10.7 m (35 ft) deployed 15,824 kg (34,886 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Kibo Exposed Facility (JEM-EF) 2J/A 2009-07-15 Space Shuttle Endeavour (STS-127) Assembly Of The International Space Station  Assembly Of The International Space Station 
Poisk (MRM-2) 5R 2009-11-10 Soyuz-U (Progress M-MIM2) 4.049 m (13.28 ft) 2.55 m (8 ft 4 in) 3,670 kg (8,090 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
ELC-1 ULF3 2009-11-16 Space Shuttle Atlantis (STS-129) 6,280 kg (13,850 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
ELC-2 6,100 kg (13,400 lb) Assembly Of The International Space Station 
Tranquility (Node 3) 20A 2010-02-08 Space Shuttle Endeavour (STS-130) 6.706 m (22.00 ft) 4.48 m (14.7 ft) 19,000 kg (42,000 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Cupola 1.5 m (4 ft 11 in) 2.95 m (9 ft 8 in) 1,880 kg (4,140 lb) Assembly Of The International Space Station 
Rassvet (MRM-1) ULF4 2010-05-14 Space Shuttle Atlantis (STS-132) 6 m (20 ft) 2.35 m (7 ft 9 in) 8,015 kg (17,670 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Nauka Science Airlock
Nauka RTOd Radiator
ERA portable workpost
Leonardo (PMM) ULF5 2011-02-24 Space Shuttle Discovery (STS-133) 6.6 m

(22 ft)

4.57 m (15.0 ft) 4,082 kg (8,999 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
ELC-4 3,735 kg (8,234 lb) Assembly Of The International Space Station 
AMS-02 ULF6 2011-05-16 Space Shuttle Endeavour (STS-134) 7,500 kg (16,500 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
OBSS Assembly Of The International Space Station 
ELC-3 6,361 kg (14,024 lb) Assembly Of The International Space Station 
HRSGF CRS SpX-2 2013-03-13 Falcon 9 (SpaceX CRS-2)
BEAM CRS SpX-8 2016-04-08 Falcon 9 (SpaceX CRS-8) 4.01 m (13.2 ft) 3.23 m (10.6 ft) 1,413 kg (3,115 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
IDA-2 CRS SpX-9 2016-07-18 Falcon 9 (SpaceX CRS-9) Assembly Of The International Space Station 
IDA-3 CRS SpX-18 2019-07-25 Falcon 9 (SpaceX CRS-18)
Bartolomeo CRS SpX-20 2020-03-06 Falcon 9 (SpaceX CRS-20).
Nanoracks Bishop Airlock CRS SpX-21 2020-12-06 Falcon 9 (SpaceX CRS-21) 1.80 m (5 ft 11 in) 2.014 m (6 ft 7.3 in) 1,059 kg (2,335 lb) Assembly Of The International Space Station 
iROSA 1 and 2 CRS SpX-22 2021-06-03 Falcon 9 (SpaceX CRS-22) 325 kg (717 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
Nauka (MLM-U) 3R 2021-07-21 Proton-M 13 m (43 ft) 4.25 m (13.9 ft) 20,300 kg (44,800 lb) Assembly Of The International Space Station  Assembly Of The International Space Station 
European Robotic Arm 11.3 m (37 ft) 630 kg (1,390 lb)
Nauka SSPA-GM temporary docking adapter
MLM Means of Attachment of Large payloads
(LCCS Part)
79P 2021-10-28 Soyuz 2.1a (Progress MS-18)
Prichal 6R 2021-11-24 Soyuz 2.1b (Progress M-UM) 4.91 m (16.1 ft) 3.3 m (11 ft) 3,890 kg (8,580 lb) Assembly Of The International Space Station 
MLM Means of Attachment of Large payloads
(SCCS Part)
82P 2022-10-26 Soyuz 2.1a (Progress MS-21)
iROSA 3 and 4 CRS SpX-26 2022-11-26 Falcon 9 (SpaceX CRS-26) 325 kg (717 lb) Assembly Of The International Space Station 
iROSA 5 and 6 CRS SpX-28 2023-06-05 Falcon 9 (SpaceX CRS-28) 325 kg (717 lb) Assembly Of The International Space Station 

Future elements

  • In January 2021, NASA announced plans to upgrade the station's solar arrays by installing new arrays on top of all the station's eight existing arrays. Six were delivered in three pairs, each pair aboard SpaceX CRS-22 in June 2021, SpaceX CRS-26 in November 2022 and SpaceX CRS-28 in June 2023. Two more will be delivered in one pair aboard a future mission in 2025.
  • Axiom Space plans on launching several modules to connect where PMA-2 is currently at as part of the commercial Axiom Station project. At the end of the ISS's life, Axiom Station could be detached from the ISS and continue in orbit as a commercial low orbit platform.

Cancelled modules

Assembly Of The International Space Station 
Diagram of the planned ISS circa 1999

Unused modules

The following module was built, but has not been used in future plans for the ISS as of January 2021.

  • American Node 4 – Also known as the Docking Hub System (DHS), would allow the station to have more docking ports for visiting vehicles and would allow inflatable habitats and technology demonstrations to be tested as part of the station.

Cost

The ISS is credited as the most expensive item ever built, costing around $150 billion (USD), making it more expensive than Skylab (costing US$2.2 billion) and Mir (US$4.2 billion).

See also

References

Tags:

Assembly Of The International Space Station LogisticsAssembly Of The International Space Station Columbia disaster and changes in construction plansAssembly Of The International Space Station Assembly sequenceAssembly Of The International Space Station Future elementsAssembly Of The International Space Station Cancelled modulesAssembly Of The International Space Station Unused modulesAssembly Of The International Space Station CostAssembly Of The International Space Station

🔥 Trending searches on Wiki English:

Marie AntoinetteChernobyl disasterA2022 FIFA World CupNewcastle United F.C.MoonbinLarry Allen AbshierTom CruiseBarbra StreisandJennifer Lawrence2023 Southeast Asian GamesRobert F. Kennedy Jr.Mahatma GandhiGoogle MapsShrek (franchise)Antonio BrownMatt DamonEuropeCarlos AlcarazTom HollandCanadaRDFaJuno TempleUnited KingdomKyrie IrvingXXXX (beer)Zoe SaldañaAnthony Davis.xxxMatthew McConaugheyDeath of Benito MussoliniParrondo's paradoxTitanicThe Hunger GamesDuty After SchoolMarvel Cinematic UniverseList of Scream (film series) charactersRupert MurdochBlake LivelyTrisha (actress)Pirates of the Caribbean (film series)Rufus SewellGoogle TranslateKeion WhiteNatasha LyonneTarek FatahEFL League TwoCarol Burnett2023ChinaPhilippinesJSON-LDJoe BidenEnglish languageKillers of the Flower Moon (film)James CordenHenry CavillRob McElhenneyBad BunnyArnold SchwarzeneggerSmokey RobinsonLionel MessiList of WWE personnelMichael OherPriscilla PresleyJack BlackSerie A2010 Northumbria Police manhuntNefarious (film)ChengizJudy BlumeRyan MasonAshley OlsenPolite Society (film)Russo-Ukrainian War🡆 More